Node 001 · 12-Hour Endurance Test
Edge Node 001 operated continuously for approximately 12 hours while hosting the EmpowerEd Edge platform and its own local network.
- Continuous operation
- ~12 hours
- CPU temperature at test end
- 47.2°C
- Thermal / throttling status
0x0No throttling detected
End-of-test observations
- EmpowerEd Edge remained fully accessible at
empowered.local. - The Edge local network remained operational.
- Remote SSH administration remained operational.
- The node completed a normal remote software shutdown after testing.
Result: PASS for this endurance run. Temperature and throttling readings reflect the end of the test. This entry does not establish results for offline operation, concurrent-user capacity, power recovery, or AI performance.
